Planning for Stage 2 work:

The tendering process to appoint the construction company for Stage 2 is currently being completed, with actual works planning to commence within next month. The intention is for all of these works to be managed through to completion in 2019. The specific works are still to be confirmed once the pricing and appointment process is confirmed. The current designs include the following:

• Construction of a new specialist Science block extending onto A Block
• Demolition and construction of a new Performing Arts Centre (PAC), including an 800 seat auditorium and two new large Drama rooms.
• Further replacement of underground water pipes and infrastructure
• Substantial refurbishment of existing classroom spaces across the school (especially S and K Blocks) and new landscaping of outside areas.